Multiple critical failures:
- Direct-to-wood torch application (Fire Hazard & Code Violation): Torching directly to plywood violates IBC 1507.11.2 and manufacturer specs. You need a thermal barrier (e.g., 1/2" gypsum, DensDeck, or a nailed base sheet) between flame and combustible deck. This is a major fire risk—hot mopping or torching wood decks causes structure fires regularly.
- No base sheet: Modified cap sheet requires a mechanically fastened or adhered base sheet (per IBC 1507.11.2 & ARMA/NRCA guidelines). Cap sheet alone lacks tensile strength and puncture resistance.
- Wall flashing sequence wrong: Torching "up to stucco" implies no counterflashing. Correct: Run base/cap sheet up wall min 8" (IBC 1503.2), install termination bar/sealant, then stucco contractor cuts reglet and installs counterflashing. You cannot seal to raw stucco reliably.
- Skylight curb detail missing: Torching around a wood curb without a pre-flashed curb wrap, cant strip, and counterflashing guarantees leaks. Wood curbs require metal flashing integration per IBC 1503.2 / NRCA details.
- Cold-night cure abandonment: Modified bitumen needs time to cool/set without traffic or thermal shock. Leaving at 4 PM with no QA inspection (seam probes, adhesion checks) is negligent.
Stop work. Require: Fire watch during torch ops, approved thermal barrier/base sheet, proper wall/curb flashing details, and daytime completion with seam verification.