For a 42-inch-wide masonry chimney, you need a full two-piece flashing system (base/step + counter-flashing) plus a cricket (saddle). Code (IRC R903.2.2 / IBC 1503.2) requires crickets on chimneys >30 inches wide.
Material: 26-ga galvanized steel (G-90 min), copper (16 oz), or aluminum (.032"). No roll flashing. Match roof life expectancy.
Package Components:
- Apron (Head) Flashing: One piece, full width + 8" min each side (58" total). Extends 4" min up chimney face, 4" min onto roof deck. Hemmed drip edge at bottom.
- Step Flashing: 5"x7"x8" (min) pieces, one per course (approx. 20–25 pcs). Bend: 4" up chimney, 4" on deck. Install under shingles, over underlayment. Turn top corner 1" into mortar joint.
- Counter-Flashing (Cap Flashing): Reglet-set into mortar joint 1.5" min deep (IRC R903.2.2). Not surface-mounted/caulked. Sections: two sides, rear (over cricket), front (over apron). Overlap base flashing 2" min. Solder seams (copper) or seal with polyurethane (steel/alum).
- Cricket (Saddle): Required (width >30"). Frame 2x on roof deck, sheath, ice & water shield full coverage. Valley flashing (W-style) at roof-cricket intersection. Cricket slope ≥ roof slope. Cover with roof cladding (shingles/metal) then install rear counter-flashing over it.
- Ice & Water Shield: Full deck coverage under cricket & 3 ft up roof from chimney. Wrap 12" up chimney faces before base flashing.
Critical Details:
- No exposed fasteners on vertical legs.
- Counter-flashing must be removable for repointing.
- Seal reglet with polyurethane, not silicone.
- If chimney >48" wide, cricket needs internal drainage (scupper) or double valley.
Verify: Masonry condition. Repoint open joints before flashing. If flue tiles project <4", extend crown.