Step flashing at a shingle-to-sidewall transition with lap siding:
Installation sequence (bottom to top):
- Kickout/diverter flashing at roof edge — directs water into gutter, not behind siding
- First step flashing piece (typically 8"×8" bent 90°, 4" up wall, 4" on roof) nailed to roof deck only — not to wall
- Shingle course over step flashing, nailed per manufacturer specs
- Next step flashing overlapping previous by 2–3", same nailing rule
- Repeat to top of penetration
Critical details:
- Step flashing goes UNDER siding — siding laps over the vertical leg. Never caulk this joint; it's a drainage plane.
- Housewrap/WRB must lap over step flashing vertical legs (shingle-style). Tape seams.
- Counterflashing (if required by siding mfr) installs over step flashing vertical leg, under WRB.
- Nailing: Roof deck only. Wall nailing prevents movement and tears flashing.
- Kickout flashing mandatory at bottom per IRC R903.2.1 / IBC 1503.2 — prevents rot at sidewall base.
Common failures: Caulking step-to-siding joint (traps water), nailing to wall, missing kickout, WRB behind flashing instead of over.
Code: IRC R905.2.8.3 (step flashing), R903.2.1 (kickout), R703.1 (WRB lapping).
If siding is already installed, you'll need to remove bottom courses to integrate properly. No shortcuts — this detail fails silently and expensively.