I'm putting in open metal valleys on a shingle roof.

Prompt as given to every model

I'm putting in open metal valleys on a shingle roof. Walk me through the metal and how the shingles meet it.

Model answers

Pick up to two to compare side by side. Score chips fill in as the judge grades.

Nemotron 3 Ultra 550BScore —

Metal Selection & Prep

  • Material: Minimum 26-gauge galvanized steel (G-90), aluminum (.032"), or copper (16 oz). Painted steel is standard. IRC R905.2.8.2 requires valley lining.
  • Width: 18" minimum (W-valley) or 24" minimum (V-valley). Wider is better for cut valleys.
  • Profile: W-valley (center rib) is strongly preferred over V-valley. The rib prevents cross-wash (water shooting up the opposite slope).
  • Length: Max 10-ft sections. Overlap 12" minimum downhill. Seal overlaps with butyl tape or polyurethane sealant.
  • Underlayment: Run ice & water shield (self-adhered) full width of valley before metal. Center it. IRC R905.2.8.2 / R905.1.2.

Installation Sequence

  1. Drip Edge: Install eave drip edge first. Valley metal laps over it.
  2. Valley Metal: Center metal on valley centerline. Fasten only at outer edges (1" in from edge) with 1" neoprene-washer roofing nails or ring-shank nails on 12" centers. Do not nail near center rib. Let it float for expansion.
  3. Shingle Layout: Snap chalk lines 3" from center rib each side (6" total exposed metal). This is your cut line.
  4. Shingling: Run shingles from both slopes toward valley. Do not nail within 6" of chalk line. Press shingles flat into valley pan.
  5. Cutting (Open Cut Valley): Cut top-layer shingles after installation using a hook blade. Cut on the chalk line (3" from rib). Cut corners at 45° (dog-ear) to direct water.
  6. Sealing: Dab asphalt plastic cement (ASTM D4586) under each cut shingle corner (1" diameter spot) where it overlaps metal. Do not run a continuous bead—traps water.

Critical Details

  • No nails in shingles within 6" of valley center.
  • No caulk/sealant on top of metal where shingles lie (creates dams).
  • Clean metal of shingle granules/debris daily.
  • Ventilation: Ensure ridge vent/baffles don't dump water into valley.

Code Check: IRC R905.2.8.2 (Valley flashing), R905.2.8.3 (Valley shingling), R905.1.2 (Ice barrier). Manufacturer instructions override for specific shingle warranties.

729 tokens · 20.7s

Judge rubric · pending

Not graded yet. Grading starts when the exam run completes.

Nemotron 3 Super 120BScore —

For open metal valleys on a shingle roof, follow these steps per IRC R905.2.8 and manufacturer guidelines (e.g., GAF, Owens Corning):

  1. Valley Metal Selection: Use corrosion-resistant metal — minimum 26-gauge galvanized steel, 0.019" aluminum, or 16-oz copper. Width: at least 24" (wider for steep pitches or high snow loads). Lap sections 6" minimum, sealed with roofing cement.
  1. Underlayment: Install self-adhering ice and water shield along the entire valley, extending at least 12" on each side of the centerline. Overlap seams 6". This is critical — metal valleys leak if underlayment fails.
  1. Metal Installation: Lay the valley metal over the underlayment, centered. Secure with nails only at the top edge (to allow thermal movement). Do not nail through the flat of the valley — this causes leaks. Seal overlapping joints with asphalt roof cement.
  1. Shingle Application: - Cut shingles to stop 6" from the valley centerline (3" each side for a 6" exposure). - Do not nail within 6" of the centerline. - Seal the cut edge with a 1/2" bead of roofing cement along the valley flange — this creates a water barrier and prevents wind uplift. - Weave or lace method is NOT used in open valleys — shingles are cut clean and sealed.
  1. Key Detail: The shingles must not touch or cross the valley centerline. Water flows freely down the metal; shingles act as a splash guard. Improper nailing or sealing here is the #1 cause of valley leaks.

⚠️ If roof pitch < 3:12, or if using certain shingle types (e.g., some laminated), consult manufacturer — some require modified details. When in doubt, hire a licensed roofer. Metal valley work is unforgiving of errors.