Clay County, FL (FBC 8th Ed. / 2023 FBC-R) requires strict adherence to FBC-R §R905.2.8.5 and the manufacturer’s installation instructions (FBC-R §R905.1).
1. Profile & Material
- Type: Type D (T-style) or Type F (extended flange) metal drip edge. Minimum 0.019" (26 ga) galvanized steel or 0.024" aluminum (FBC-R §R905.2.8.5).
- Overlap: Minimum 2-inch lap at joints.
*2. Eaves (Bottom Edge) – Under Underlayment*
- Install drip edge directly to deck before underlayment.
- Fasteners: Ring-shank roofing nails (min 12 ga, 3/8" head) or #8 screws.
- Spacing: Max 12" o.c. (FBC-R §R905.2.8.5). Max 4" o.c. within 4 ft of corners/edges if in High Velocity Hurricane Zone (HVHZ) or per FRSA/TRI Florida High Wind Manual (Clay County is 130–140 mph Vult; treat as high wind).
- Seal fastener heads with asphalt plastic cement.
*3. Rakes (Gable Ends) – Over Underlayment*
- Install over the underlayment (and ice barrier if used).
- Same fastener type/spacing as eaves (12" o.c. field; 4" o.c. corners).
- Extend rake drip edge over eave drip edge at corners (shed water).
4. Critical Florida Details
- Seal the Deck: FBC-R §R905.1.1 requires a sealed roof deck (tape seams or synthetic underlayment). Run underlayment over eave drip edge flange; run rake drip edge over underlayment.
- Kick-Out Flashing: Required at all roof-to-wall intersections (FBC-R §R903.2.1).
- Inspection: Clay County Building Dept requires in-progress inspection (dry-in) before shingles. Leave fasteners exposed for verification.
Pro Tip: Use 1¼" ring-shank nails for 15/32" deck; 1½" for 19/32"+. Don’t staple. If deck is questionable, re-nail deck to FBC-R §R803.2.3 (6" edge/12" field) before installing drip edge.
Verify current local amendments with Clay County Building Dept (904-269-6331) before starting.