Two major code violations (IPC/UPC):
- Trap Arm Length Exceeded (IPC 1002.4 / UPC 909.1 / 1014.1): Maximum developed length for a 1½" trap arm is 5 feet (60 inches) to the vent connection. At 9 feet (108 inches), you have no vent protection. The trap will siphon dry. This is the primary failure.
- Trap Size Mismatch (IPC 701.2 / UPC 701.1): A 1½" trap arm cannot connect directly to a 2" sanitary tee on the stack. The trap arm diameter must equal the trap outlet (1½") or the drainage pipe size (2"), but you cannot reduce the trap arm downstream of the trap. You need a 1½" x 2" increaser at the tee, or a 2" trap arm with a 2"x1½" reducer at the trap outlet.
Fix:
- Option A (Preferred): Move the fixture ≤5 ft from the stack.
- Option B: Install a vent take-off within 5 ft of the trap (vertical vent up through roof or tie into stack above flood level). The 9-ft horizontal run then becomes a drain, not a trap arm.
- Option C: Use an AAV (Air Admittance Valve) on a vent take-off within 5 ft of trap if local amendment allows (IPC 917 / UPC 603.5.2).
Slope Note: ¼"/ft is correct for 1½"–2" pipe, but irrelevant if the vent distance is illegal.
Tell the apprentice: "Slope drains water; vents protect traps. You have a 9-ft trap arm with no vent. Rip it back."