Jacksonville (Florida Building Code – Plumbing, 8th Ed. / 2021 FBC-P) requires a 10-ft head of water for the DWV water test. FBC-P §712.2.2 (mirroring IPC §712.2.2): “The water test shall be applied to the drainage and vent system… by filling the system with water to a point not less than 10 feet (3048 mm) above the highest fitting connection.”
Key Jacksonville/Florida nuances:
- Test height: 10 ft above the highest fixture connection (not just the highest floor). On a two-story, that usually means filling from a cleanout or test tee on the roof vent stack.
- Duration: Hold for 15 minutes minimum (FBC-P §712.2.2).
- No leaks: Zero leakage at joints, traps, or fixtures.
- Roof vents: Must be terminated and capped for test; inspector will verify water at roof level.
- Alternate air test: 5 psi air for 15 min allowed only if water test is impractical (FBC-P §712.3), but most Jacksonville inspectors prefer water.
Bottom line: Same 10-ft head as model IPC. Prep roof access, cap vents, fill to 10 ft above top-floor fixture flood rim, hold 15 min. Call for inspection with water in system.