Liner Rules (IRC P2709 / UPC 408.7 / TCNA B415):
- Material: Minimum 40-mil PVC (ASTM D4551) or CPE. No 30-mil "shower pan liners" sold for other uses.
- Slope: Liner must be installed over a pre-slope (min ¼"/ft) sloped to the drain. Flat liners hold water and rot.
- Height: Extend minimum 3" above curb top (IRC P2709.2) and 6" up walls (TCNA) behind backer board.
- Corners: Use pre-formed corner dams or fold/cut/glue per manufacturer. No raw folds at dams. Solvent weld all seams (PVC cement).
- Drain Connection: Clamp liner between drain body clamping ring and flange. Use manufacturer’s sealant/gasket. No screws through liner. Weep holes in clamping ring must stay open (protect with gravel/keepers).
- Curb: Liner runs continuous over curb top. No seams on curb top. Fasten liner only at outer curb edge (staples/nails above curb line). Never penetrate liner on top or inside face.
- Penetrations: Seal valve/shower arm penetrations with boot/flange kits solvent-welded to liner. Silicone is not a primary seal.
- Protection: Cover liner immediately with mortar bed. Protect from trades/damage.
Flood Test (Mandatory - IRC P2709.3 / UPC 408.7.2):
- Plug drain below weep holes (test plug in pipe or inflatable).
- Fill to curb top (or 2" min above threshold).
- Mark water level. Wait 24 hours (IRC) / 15 min (UPC min, 24 hrs best practice).
- Pass: No level drop. Fail: Any drop = find leak, repair, retest.
- Document with photos/time-stamps for inspector.
Critical: Do not install tile/mud bed over untested liner. If curb is concrete block, liner must wrap over top; do not embed curb in liner.