OSHA’s Lead in Construction Standard (29 CFR 1926.62) applies strictly to your crew. EPA RRP rules (40 CFR 745) cover the building/occupant; OSHA covers your employees. You must comply with both.
Immediate Requirements (Trigger Tasks): Dry scraping and heat gunning are "trigger tasks" presumed >50 µg/m³ (1926.62(d)(2)). Until you have personal air monitoring proving otherwise, you must provide:
- Respiratory Protection: Minimum half-mask air-purifying respirator with P100 filters (1926.62(f)(1)(i)).
- Protective Work Clothing: Full-body coveralls, gloves, head/foot coverings (1926.62(g)(1)).
- Change Areas: Clean change area, separate storage for street/clothes, showers (if feasible) (1926.62(i)).
- Hand/Face Washing: Facilities at exit (1926.62(j)).
- Training: Lead hazard training per 1926.62(l) before start.
- Blood Lead Monitoring: Initial blood test (BLL/ZPP) for each worker (1926.62(j)(1)(i)).
Exposure Assessment: You must conduct personal air monitoring during this work to determine actual 8-hr TWA (1926.62(d)(2)). If results exceed PEL (50 µg/m³), you need:
- Engineering Controls: HEPA vacuums, local exhaust ventilation, wet methods (heat gunning makes wet methods tricky; use HEPA shrouds).
- Respirator Upgrade: Full-face PAPR or supplied-air if >500 µg/m³ (1926.62(f)(1)(ii)).
- Medical Surveillance: Continued BLL monitoring per 1926.62(j)(1)(ii).
- Hygiene: Mandatory showers (1926.62(i)(4)).
Written Compliance Plan: Required before job start per 1926.62(e)(2).
Critical: Heat guns >1100°F create lead fume (highly inhalable). OSHA strongly discourages open-flame/heat gun removal. Use infrared paint strippers or chemical strippers instead. If heat guns are used, keep temp <700°F and use HEPA local exhaust at the tip.
Bottom line: You cannot start this work tomorrow without the respirators, coveralls, hygiene setup, training records, and initial blood draws scheduled.