Spacing: Per TMS 402/602 (Building Code Requirements for Masonry Structures), maximum control joint spacing is 25 ft for walls with joint reinforcement (ladder/truss) and 20 ft without. For your 90-ft wall, place joints at 20–25 ft intervals (4–5 joints total). Locate at:
- Changes in wall height/thickness
- Within 10 ft of corners/returns
- At movement discontinuities (column interfaces, openings)
Construction (Running Bond):
- Block Prep: Use sash units (open-end) or cut standard units to create a continuous vertical keyway. Do not use full blocks with mortar joints only—that cracks randomly.
- Joint Width: 3/8" to 1/2" wide.
- Bond Break: Insert polyethylene sheet or building paper (15# felt) in the keyway to prevent mortar bond across joint.
- Reinforcement: Discontinue horizontal joint reinforcement (ladder wire) at the joint. Stop wires 2" short of each face. Do not bridge the joint.
- Vertical Steel: If grouted cells with vertical rebar are required (structural), stop rebar 1" short of joint and place a greased dowel/sleeve across for shear transfer if engineering requires. Otherwise, omit vertical steel at joint.
- Backer Rod & Sealant: After tooling mortar joints (concave), install closed-cell backer rod and polyurethane sealant (ASTM C920, Class 25) at both faces. Depth = width (3/8"–1/2").
Critical: Keep mortar out of the joint during laying. Clean keyway daily. Sealant is the weather barrier; mortar is not.
Code Ref: TMS 402 Sec. 7.12.2.1, 7.12.2.2; ASTM C920.