No. Do not retemper mortar that has begun to set. Once the hydration reaction starts (initial set), adding water destroys the cement paste structure, drastically reducing bond strength, compressive strength, and durability. This violates ASTM C270 and TMS 602/ACI 530.1 Art. 3.3.B, which prohibit retempering after initial set.
Practical rules:
- Portland cement/lime mortar: Usable life is ~2.5 hours max (less in heat/wind). If it’s stiff at 10:30 (3.5 hrs), it’s dead. Pitch it.
- Masonry cement mortar: Similar window. Stiffening = hydration underway.
- Only exception: If it stiffened solely from water evaporation (rare, usually <1 hr) and is still plastic, you may retemper once within the first 30–60 minutes per ASTM C270 Note X1.2. At 3.5 hours, this does not apply.
Tell your helper: Mix batches small enough to use in 60–90 minutes. In hot/dry/windy conditions, cover the board, use cool water, and mix smaller batches. Wasted mortar is cheaper than a failed wall.