They missed three critical code/performance items that will rot your wall and slab:
- No Weep Screed Clearance (IRC R703.7.2.1 / IBC 2512.1.2): Stucco requires a minimum 4" clearance from grade to the bottom of the weep screed. You have 0". Water wicks up the stucco, rots the framing, and dissolves the slab edge.
- No Drainage Plane/Flashings at Wall Base: Fill against the wall bridges the weather-resistive barrier (WRB). You need a termination bar with drip flashing above the new grade, sealing the WRB to the foundation, before backfilling.
- Irrigation Spraying the Wall (IRC P2904 / Manufacturer Specs): Spray heads hitting stucco saturate the assembly. Code requires irrigation to not discharge on exterior walls. Convert to drip/bubblers or move heads min. 24" away.
Fix (requires excavating the bed):
- Dig out 12–18" wide along wall, down to slab.
- Clean wall, apply fluid-applied waterproofing (e.g., RedGard, Hydro Ban) on concrete stem wall up 12".
- Install stainless termination bar with drip edge at min. 4" above final grade. Seal top edge to WRB/stucco.
- Backfill with gravel (not soil) to within 4" of weep screed. Top 4" = soil/sod.
- Install French drain at bottom of gravel trench, daylighting or to sump.
- Cap spray heads; run drip line for plants.
Do not just "dig a trench" or add gutters. The wall-to-grade detail is wrong. Hire a stucco/waterproofing specialist, not the landscaper.