First 2 Weeks (Establishment): Water 2–3× daily (5–10 min/cycle) to keep sod and underlying soil constantly moist. Check by lifting a corner—soil should be wet 2–3" down. Adjust for rain/heat.
Weeks 3–4 (Rooting): Reduce to 1× daily (15–20 min), early morning (4–8 AM). Soil should stay moist 4–6" deep. Roots should resist gentle tug by day 14–21.
Mowing: First cut when grass reaches 3.5–4" (usually day 10–14). Set mower to 3" (never remove >1/3 blade). Bag clippings first 2 mowings.
Fertilizing: Wait 4–6 weeks post-install. Apply 1 lb N/1,000 ft² slow-release (e.g., 16-4-8 or 15-0-15) after second mowing. Water in lightly. No starter fertilizer needed if soil was prepped per UF/IFAS guidelines.
Key Checks:
- No foot traffic weeks 1–2.
- Watch for gray-blue blades (drought stress) or mushrooms (overwatering).
- Florida: Follow local watering restrictions (often 2×/week max after establishment).
Source: UF/IFAS ENH11, "St. Augustinegrass for Florida Lawns"; FL Building Code §R302.1 (erosion control during establishment).