Yes, callbacks are likely. Here's why and what to fix:
Immediate fixes needed:
- Missed studs: Remove screws that aren't in studs and properly fasten to framing. Loose screws will pop or fall out.
- Torn paper (10%): These are stress points. Either remove and relocate, or if close enough to stud, drive properly. Torn paper compromises holding power.
- Angled screws: Not inherently wrong (toe-screwing into stud edge is acceptable), but ensure they're actually in wood and not just paper.
Code reference: IRC R703.4 requires fasteners to "penetrate framing members" - missed studs violate this.
What will fail:
- Loose/missing screws → pops, cracks, potential drywall damage
- Torn paper areas → screw heads will dimple or pull through under stress
- Angled screws not in stud → same failure modes
Walk it again after corrections. Check:
- All screws hit solid framing
- No torn or lifted paper
- Consistent 8" spacing (acceptable per most specs)
- Screw heads properly set (not over-driven)
Bottom line: Fix the missed studs and torn paper now. The angled screws are fine if they're in wood. You'll get callbacks on the loose ones within weeks/months when the drywall shifts or humidity changes.
Tell your apprentice: "Every screw must bite wood. If you can see the paper tearing, it's not holding."