BlueCollarBench

Trades/Drywall & Interior Finish

Drywall & Interior FinishTask DR-023journeymanCodeUS

Tub-shower combo with a tiled surround.

Prompt as given to every model

Tub-shower combo with a tiled surround. Can I hang greenboard behind the tile, and does code say what has to go there?

Model answers

Pick up to two to compare side by side. Score chips fill in as the judge grades.

Laguna S 2.1Score —

No. Greenboard is not permitted in tub/shower areas.

Code requirement:

  • IRC P2730.4 and UPC 415.10 require tile in tub/shower areas to be installed on water-resistant or vapor-retardant surfaces.
  • Greenboard is explicitly prohibited in these wet areas by both codes.

What you must use:

  • Cement backer board (e.g., Durock, HardieBacker) — this is the standard, code-compliant substrate for tiled tubs/showers.
  • Install over studs with proper fasteners, tape seams with alkali-resistant mesh tape and thinset.
  • Some jurisdictions allow fiber-cement board or modified gypsum backer board rated for wet areas (check local code).

Key points:

  • Greenboard is only approved for areas with moderate moisture (like general bathrooms), not direct water exposure.
  • Tile must be installed per manufacturer's instructions over an approved substrate.
  • Always check local amendments — some areas have additional requirements.

Bottom line: Remove the greenboard and install cement backer board. It's the only code-compliant option for your tub-shower surround.

346 tokens · 13.6s

Judge rubric · pending

Not graded yet. Grading starts when the exam run completes.

Nemotron 3 Ultra 550BScore —

No. Do not use greenboard (water-resistant drywall) behind tile in a tub/shower surround. It is prohibited by code for wet locations.

Code Citations:

  • IRC R702.4.2 / IBC 2509.2: Water-resistant gypsum backing board (greenboard) shall not be used where there will be direct exposure to water, or in areas subject to continuous high humidity (saunas, steam rooms, gang showers).
  • IRC R702.4.1 / IBC 2509.1: Tile in tub/shower areas requires a water-resistant barrier behind it. Acceptable substrates per Table R702.4.2 / ASTM C1178/C1288/C1325 include:
  • Cement board (CBU)
  • Fiber-cement board
  • Glass mat gypsum backing panel (e.g., DensShield, USG Mold Tough — not greenboard)
  • Coated glass mat water-resistant gypsum backing panel
  • Polymer-coated gypsum panels (specific approvals only)

Practical Requirement: You must install a waterproofing membrane (liquid-applied or sheet membrane per ANSI A118.10) over the approved backer board, or use a surface-applied waterproofing system (like Schluter Kerdi or Hydro Ban) directly over the approved backer board. Greenboard fails when wet; it swells, loses strength, and grows mold behind the tile.

Correct Assembly (Typical):

  1. Studs
  2. Vapor barrier (poly or #15 felt) or liquid membrane on backer board face (check manufacturer)
  3. Approved Backer Board (Cement board, Fiber-cement, or Coated Glass Mat panel)
  4. Waterproofing Membrane (Liquid/Sheet on face of board)
  5. Thinset + Tile

Bottom Line: Greenboard is for damp areas (bathroom ceilings, walls outside the splash zone). Inside the shower/tub surround: Cement board, Fiber-cement, or Coated Glass Mat panel + Waterproofing.

586 tokens · 31.8s

Judge rubric · pending

Not graded yet. Grading starts when the exam run completes.