We framed a dropped soffit over the kitchen cabinets that's open to the stud wall behind it, and the inspector says we can't hang until something is fixed.

Prompt as given to every model

We framed a dropped soffit over the kitchen cabinets that's open to the stud wall behind it, and the inspector says we can't hang until something is fixed. What's he looking for?

Model answers

Pick up to two to compare side by side. Score chips fill in as the judge grades.

Laguna S 2.1Score —

The inspector is most likely flagging an unsealed air path between the soffit (dropped ceiling) and the wall cavity behind it.

Per IRC M1601.5 and G2407.5, any cavity that connects to a wall chase or ceiling space used for HVAC return air must be properly sealed to prevent:

  • Unfiltered air bypassing the furnace filter
  • Fire spreading through concealed spaces
  • Insulation/debris falling into the HVAC system

What to fix: Seal all gaps between the soffit framing and the wall behind it using:

  • Fire-rated caulk or foam (for gaps >1/4")
  • Metal flashing sealed with mastic (preferred for larger openings)
  • Drywall or plywood to fully close the opening, then tape/mud

If the soffit is meant to be a return air plenum, it must be constructed per SMACNA IAQ Guidelines — smooth interior, accessible, and sealed.

Quick fix: Close the opening completely with drywall and fire-caulk all seams. This satisfies safety and air quality requirements.

If you intended an open return, you’ll need to frame it properly as a listed return air pathway with proper filtration.

Let me know if the soffit is structural or HVAC-related — that changes the approach.

392 tokens · 6.0s

Judge rubric · pending

Not graded yet. Grading starts when the exam run completes.

Nemotron 3 Ultra 550BScore —

The inspector is citing IBC 718.2 / IRC R302.11 (Fireblocking). That open soffit creates an unobstructed vertical/horizontal path for fire and smoke to travel between the stud wall cavity, the soffit, and the floor/ceiling assemblies above.

You must install fireblocking to close off the concealed draft openings. Specifically:

  1. At the top plate: Block between studs where the wall meets the soffit ceiling (or floor above). Use 2x nominal lumber, ¾" plywood/OSB, or ½" gypsum board friction-fit and nailed.
  2. At the soffit level: Block the stud bay at the bottom of the soffit (where the soffit meets the wall) to separate the wall cavity from the soffit cavity.
  3. At penetrations: Fireblock around any pipes, ducts, or wires passing through these blocking points (IRC R302.11.1 / IBC 718.3.1).

Materials: 2x blocking, ¾" wood structural panels, ½" Type X gypsum, or listed fireblocking foam/caulk for small gaps around penetrations. Mineral wool batts are not accepted as fireblocking per code (only as firestopping in rated assemblies).

Pro tip: If the soffit runs parallel to joists, you likely need blocking at the joist bays too (IRC R302.11.4). Install blocking tight; gaps >1/8" fail.

Do not hang drywall until the inspector signs off on the rough fireblocking inspection.

461 tokens · 3.3s

Judge rubric · pending

Not graded yet. Grading starts when the exam run completes.