Structural concerns:
- Thrust force increase - Removing ceiling joists eliminates the tension tie that resisted rafter thrust. Your 24' span at 6/12 with 2x6 rafters @ 24"o.c. now relies solely on the 2x8 ridge board for resistance. This is likely undersized for the increased loads.
- Ridge board adequacy - A 2x8 ridge board may not handle the concentrated thrust forces from a 24' span without ceiling joists. Consider upgrading to a 2x10 or LVL beam sized for the load.
- Wall spread - Without ceiling joists tying walls together, rafter thrust will push walls outward. Monitor for gaps at wall plates or leaning walls.
- Rafter connection - Ensure rafters are properly secured to the ridge board with appropriate metal connectors (not just nails).
What's coming:
- Potential wall spreading within 6-12 months
- Ridge board failure under sustained load
- Drywall cracking as rafters deflect
- Possible ceiling joist connection points failing at the remaining sections
Immediate action: Install temporary rafter ties (2x4s) across the vaulted section at mid-height to prevent wall spread until permanent structural reinforcement is designed. Consult a structural engineer for proper sizing of ridge beam and any needed collar ties or knee braces.
Code reference: IRC R802.4 requires ceiling joists to be continuous or adequately tied to resist rafter thrust. Removing them requires engineered alternatives.